Case Study · Power Generation

Industrial heat recovery for power plants.

Modular removable insulation for HRSGs, gas turbines, steam piping and BOP equipment. Up to 90% heat loss reduction. Maintenance access in minutes, not days.

Case study landing under construction
Recovery
28,210 MWh/yr
Payback
17.9 months
Surface temp
≤ 45 °C
Range
up to +1000 °C